Seen within the photos are Meralco crews conducting distribution maintenance works at the Eva Macapagal Super Terminal located inside Pier 15 in Manila South Harbor that presently is a short-lived treatment facility for COVID-19 patients.
The said maintenance works include the replacement of aging power cables, re-tightening of secondary cables, and testing of the latest power cables and existing power transformer.
This facility is one of the various vital hospitals and COVID-19 treatment and testing centers within the Meralco franchise area that are given high priority when it involves providing a safe, adequate, and reliable supply of electricity.