Ensuring continuous Power Supply COVID-19 Treatment Centers

Seen within the photos are Meralco crews conducting distribution maintenance works at the Eva Macapagal Super Terminal located inside Pier 15 in Manila South Harbor that presently is a short-lived treatment facility for COVID-19 patients.

The said maintenance works include the replacement of aging power cables, re-tightening of secondary cables, and testing of the latest power cables and existing power transformer.

This facility is one of the various vital hospitals and COVID-19 treatment and testing centers within the Meralco franchise area that are given high priority when it involves providing a safe, adequate, and reliable supply of electricity.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button