Philippines’ premier property developer, Ortigas Land, kicks off the ground breaking ceremony for their new residential tower that will rise in Capitol Commons, The Empress.
Located in the heart of Pasig City, the luxury residential tower will consist of 56 floors with 51 residential floors, one podium amenity floor, 3 levels of podium parking, 7 levels of basement parking, and retail spaces at the ground level which are all Green Building Code certified. Providing an abode to discerning individuals and families in the bustling metro, Ortigas Land aims to encourage health and wellness among its residents with its premium amenities and overall structural design.
Its amenities are divided into two zones which are the Active Zone and Quiet Zone. The Active Zone allows residents to focus on their fitness and enjoyment with its lap pool, kiddie pool, and lounge areas. While the Quiet Zone is designed to allow residents to pursue relaxation and wellness with its Garden and Wellness Lawn. Other indoor amenities include a dance studio, fitness hall, social/function hall, pamper room, children’s playroom, reading room and resident’s lounge. Designed with the concept of chromatherapy (color therapy) in mind, this allows for purposeful and visually appealing spaces meant to calm and stimulate the residents as they use these common spaces.
Beyond the offerings that are grounded on health and well-being, The Empress also boasts innovations to provide seamless and convenient living for its residents. Embedded with new smart home features, the residential tower allows unit owners to control certain amenities of their homes such as unit entry, aircon temperature, and lighting fixtures using the smart home app through their smartphones. Plus, in partnership with Globe, residents can enjoy up to 2 years of Globe at Home Broadband subscription for free.
The Empress at Capitol Commons consists of a total of 771 units, providing an array of options from studio to 2-bedroom units, spanning from 30 sqm to 106 sqm. It also offers a limited 3-bedroom bi-level unit which is perfect for residents with growing families. Construction is slated to be completed in Q4 of 2026, and is the same period when units are expected to be turned over to residents.
For more information, visit Ortigas Land’s website at www.ortigas.com.ph or follow Capitol Commons’ Facebook page at www.facebook.com/capitolcommonsortigas/ to stay updated on announcements.